Group reference · Geothermal power plant

Maspo ALA-2 Geothermal Power Plant

Status unclear35 MWeAlaşehir, Manisa, Türkiye

A 35 MWe binary-cycle geothermal plant with an organic Rankine cycle (ORC) turbine-generator in Alaşehir, Manisa, connected through a 154 kV switchyard and overhead line. Enprode Engineering was its EPCM contractor.

References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.

Enprode’s responsibilities

  • Engineering, procurement and construction management (EPCM)
  • Conceptual design and feasibility report
  • Basic and detailed engineering
  • Site management
  • Test and commissioning management
  • Start-up

Maspo Energy A.Ş., an independent power producer with a geothermal power plant already in operation in Türkiye, developed the ALA-2 binary cycle geothermal power plant.

The plant is in Alaşehir, 100 km east of İzmir and 75 km south-east of Manisa, in the Aegean Region. Power comes from a binary turbine-generator with an air-cooled condenser, step-up power transformers, a 154 kV air-insulated switchyard and a 154 kV overhead transmission line.

Equipment and systems

  • Pentane supply system and storage tank
  • Air-cooled condenser
  • Separators, vaporiser and demister, preheater and recuperator
  • Re-injection pumps and pond
  • Distributed control system (DCS)
  • Compressed air, HVAC, fire protection and detection
  • Medium-voltage switchgear
  • HV switchyard and HV overhead transmission line
  • Step-up and auxiliary service transformers
  • LV main distribution panels and motor control centres
  • Battery chargers, batteries, DC distribution board and UPS
Main technical parameters
Turbine-generator1 × 35 MWe, organic Rankine cycle (ORC)
CycleBinary
Working fluidPentane
Grid connection154 kV, air-insulated switchyard and overhead line