Group reference · Geothermal power plant
Maspo ALA-2 Geothermal Power Plant
Status unclear35 MWeAlaşehir, Manisa, Türkiye
A 35 MWe binary-cycle geothermal plant with an organic Rankine cycle (ORC) turbine-generator in Alaşehir, Manisa, connected through a 154 kV switchyard and overhead line. Enprode Engineering was its EPCM contractor.
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
Enprode’s responsibilities
- Engineering, procurement and construction management (EPCM)
- Conceptual design and feasibility report
- Basic and detailed engineering
- Site management
- Test and commissioning management
- Start-up
Maspo Energy A.Ş., an independent power producer with a geothermal power plant already in operation in Türkiye, developed the ALA-2 binary cycle geothermal power plant.
The plant is in Alaşehir, 100 km east of İzmir and 75 km south-east of Manisa, in the Aegean Region. Power comes from a binary turbine-generator with an air-cooled condenser, step-up power transformers, a 154 kV air-insulated switchyard and a 154 kV overhead transmission line.
Equipment and systems
- Pentane supply system and storage tank
- Air-cooled condenser
- Separators, vaporiser and demister, preheater and recuperator
- Re-injection pumps and pond
- Distributed control system (DCS)
- Compressed air, HVAC, fire protection and detection
- Medium-voltage switchgear
- HV switchyard and HV overhead transmission line
- Step-up and auxiliary service transformers
- LV main distribution panels and motor control centres
- Battery chargers, batteries, DC distribution board and UPS
| Turbine-generator | 1 × 35 MWe, organic Rankine cycle (ORC) |
|---|---|
| Cycle | Binary |
| Working fluid | Pentane |
| Grid connection | 154 kV, air-insulated switchyard and overhead line |