200 MW
AGE Combined Cycle Power Plant
Engineering, procurement and construction management (EPCM) of all project phases
Completed
Supply line 02
Enprode Energy buys and sells power and distribution transformers for power plants, substations, industry and data centres. Tell us the rating, the voltages, the cooling and where and when the unit must arrive.
Transformers link every stage of a power system: generator step-up units at the plant, substation transformers on the grid and distribution transformers at the load. Large units have long lead times, so the details of the first enquiry matter.
Group experience
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
200 MW
Engineering, procurement and construction management (EPCM) of all project phases
Completed
62 MW
Engineering, procurement and construction management (EPCM), including the HV switchyard and overhead transmission line
Completed
77 MW
Feasibility report
Status unclear
35 MWe
Engineering, procurement and construction management (EPCM)
Status unclear
Enquiries
The more of this an enquiry carries, the more precise the first answer can be.
Gas turbines, steam turbines and turbine-generator sets for power and combined heat and power plants.
Open the lineEquipment for switchyards, substations, power lines and distribution networks.
Open the linePower equipment for data centres, backed by the group’s data centre design experience.
Open the lineOriginal equipment and spare parts for power plants, substations and data centres.
Open the line