3 × 150 MW
Garri-3 Open Cycle Power Plant
EPC (mechanical)
Ongoing
Group reference · Open cycle power plant
Ongoing2 × 150 MWPort Sudan, Sudan
An open cycle power plant project in Port Sudan with two 150 MW units, planned in two phases: gas turbine generator units for light distillate and heavy fuel oil first, then conversion to combined cycle. Enprode Engineering’s scope is mechanical EPC, from design to commissioning.
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
The project is planned in two phases. Phase I installs gas turbine generator units that run on light distillate oil (LDO) and heavy fuel oil (HFO). Phase II converts the open cycle units to combined cycle.
Enprode Engineering’s scope covers mechanical EPC: basic and detailed design and engineering, procurement, construction, commissioning and start-up, and project management.
| Units | 2 × 150 MW |
|---|---|
| Phase I | Siemens SGT5-2000E gas turbine generator units, LDO and HFO |
| Phase II | Conversion of the open cycle units to combined cycle |