870 MW
Samsun Combined Cycle Power Plant
Balance-of-plant (BOP) engineering, procurement, installation, commissioning and start-up services
Completed
Group reference · Combined cycle power plant
Completed200 MWSarayköy, Denizli, Türkiye
A 200 MW natural gas-fired combined cycle plant in Sarayköy, 22 km from Denizli, built in a 3+1 configuration: three gas turbines with heat recovery steam generators and one steam turbine. Enprode Engineering managed every phase, from conceptual design to commercial start-up.
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
AGE signed an agreement with Enprode Engineering in June 2010 for the design, engineering, procurement and construction management (EPCM) of all project phases of its 200 MW combined cycle power plant, from the conceptual design up to commercial start-up.
The plant stands on land owned by AGE in Sarayköy, a town 22 km from Denizli. It comprises three gas turbines, three heat recovery steam generators, one steam turbine and an air-cooled condenser, with an air-insulated switchyard, a gas regulating and metering station, a demineralised water plant and the main control building.
The plant was put into commercial operation in simple cycle mode on 27 July 2012, upon ministerial acceptance.
| Gross power output | 200 MWe |
|---|---|
| Gross electrical efficiency | 54.5% |
| Fuel | Natural gas |
| Configuration | 3 gas turbines + 1 steam turbine |
| Gas turbines | 3 × Siemens SGT-800 |
| Gas turbine site rating | 44,877 kWe |
| Heat recovery steam generators | Vertical gas flow, drum type |
| Steam turbine | Multi-stage condensing |
| Steam turbine output | 64.5 MWe |
| HP steam | 80 bar / 520 °C |
| Condenser | Air-cooled |
870 MW
Balance-of-plant (BOP) engineering, procurement, installation, commissioning and start-up services
Completed
775 MW
Engineering, procurement, erection, commissioning and start-up of balance-of-plant (BOP) systems
Completed
62 MW
Engineering, procurement and construction management (EPCM), including the HV switchyard and overhead transmission line
Completed