Group reference · Combined cycle power plant

Denizli Combined Cycle Power Plant

Completed775 MWDenizli, Türkiye

A 775 MW natural gas-fired combined cycle plant in Denizli with two gas turbines and one steam turbine. Enprode Engineering delivered an important part of the balance-of-plant EPC scope under a contract signed in July 2011.

References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.

Enprode’s responsibilities

  • Engineering, procurement, erection, commissioning and start-up of balance-of-plant (BOP) systems

Enprode Engineering was awarded an important part of the balance-of-plant (BOP) EPC scope of the RWE Denizli 775 MWe combined cycle power plant, under a contract signed in July 2011.

In compliance with international and local standards, design teams of senior engineers, designers and specialists worked across disciplines to deliver the engineering to the project’s requirements and schedule.

Balance-of-plant scope

  • HVAC (heating, ventilation and air conditioning)
  • Fire-fighting systems
  • Fire and gas detection systems
  • Field painting, insulation and scaffolding works
  • Aluminium isolated-phase bus
  • Underground utilities
  • External and internal lighting; security and emergency lighting
  • Telephone and data systems; CCTV
  • Building management system
  • Training management
Main technical parameters
Configuration2 gas turbines + 1 steam turbine
Gas turbines2 × Siemens SGT5-4000F
FuelNatural gas

Milestones

  1. BOP contract signed