200 MW
AGE Combined Cycle Power Plant
Engineering, procurement and construction management (EPCM) of all project phases
Completed
Group reference · Combined cycle power plant
Completed870 MWSamsun, Türkiye
An 870 MW natural gas-fired combined cycle plant in Samsun with two single-shaft power trains. Enprode Engineering delivered important parts of the balance-of-plant scope for the main EPC contractor, under a contract signed in July 2011.
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
Enprode Engineering was awarded important parts of the balance-of-plant (BOP) EPC scope of the OMV Samsun 870 MWe combined cycle power plant, under a contract signed in July 2011. Its multi-disciplinary design teams, with senior engineers and specialists, delivered the engineering to the project’s requirements and schedule, in compliance with international and local standards.
The detailed engineering used fully customised design software and modelling systems.
| Configuration | 2 single-shaft power trains |
|---|---|
| Power trains | 2 × GE single-shaft |
| Fuel | Natural gas |
200 MW
Engineering, procurement and construction management (EPCM) of all project phases
Completed
775 MW
Engineering, procurement, erection, commissioning and start-up of balance-of-plant (BOP) systems
Completed
62 MW
Engineering, procurement and construction management (EPCM), including the HV switchyard and overhead transmission line
Completed