200 MW
AGE Combined Cycle Power Plant
Engineering, procurement and construction management (EPCM) of all project phases
Completed
Group reference · Combined cycle power plant
Status unclear77 MWOsmaniye, Türkiye
A combined cycle plant with an estimated installed capacity of 77 MW in Osmaniye, with one gas turbine, a heat recovery steam generator, a steam turbine and a 154 kV switchyard. Enprode Engineering prepared its feasibility report, conceptual design and basic and detailed engineering.
References of Enprode Engineering & Construction, the Enprode group’s engineering company, as the group publishes them.
Kayalı Enerji Üretim A.Ş., an independent power producer licensed by Türkiye’s Energy Market Regulatory Authority (EMRA), is the developer of the Osmaniye combined cycle power plant, with an estimated installed capacity of 77 MW.
One gas turbine generator package produces power, and one steam turbine generator is driven by steam from a heat recovery steam generator that uses the gas turbine’s exhaust heat. Natural gas is the single fuel, for base and peak loads. The plant also has a bypass stack with diverter, an air-cooled condenser, a water treatment plant, a 154 kV switchyard and step-up and service transformers.
| Estimated installed capacity | 77 MW |
|---|---|
| Gas turbine | 1 × 63 MW, Rolls-Royce Trent 60 DLE package |
| Steam turbine | 1 × 14 MW |
| Fuel | Natural gas |
| Grid connection | 154 kV, air-insulated switchyard |
200 MW
Engineering, procurement and construction management (EPCM) of all project phases
Completed
870 MW
Balance-of-plant (BOP) engineering, procurement, installation, commissioning and start-up services
Completed
775 MW
Engineering, procurement, erection, commissioning and start-up of balance-of-plant (BOP) systems
Completed